The stage is set, the sod is laid and the sidewalks are complete. All that’s left to finish Phase I of the Campus Green are light fixtures and trees, says Susan Zumbado, project coordinator. The trees have been selected and will be planted between Thanksgiving and Christmas. The fixtures for the light poles are ordered. Only a small portion of the Green where sod recently was placed is roped off. Otherwise, Zumbado says, the Green is accepting visitors. “The sod has been in long enough that people can walk across the green or play football,” Zumbado says.