| Special Notice |
|
|
|
In Process Construction Areas SOUTH LOOP Parking lot 19 behind Hill Center will reopen May 14, 2012. 7th Ave. paving will be complete the week of May 14, 2012. TRAFFIC ALERT
15TH Street between
University Boulevard and 7th Avenue South
Effective Monday, January 23, 2012
Approximate duration: 3 months
The portion of 15th Street that lies between University Boulevard and 7th Avenue South will be closed to thru-traffic and to any on-street parking effective January 23, 2012. Access to Parking Lot 5A will be via a newly provided entry point immediately off University onto 15th Street. Exit point from Lot 5A will be on the eastern side of the lot onto 16th Street. NORTH LOOP
Vehicular Traffic Impact 7TH Avenue South
Vicinity of Volker, Lister Hill, School of Optometry, Smolian Parking
Duration – 7th Ave is scheduled to reopen week of 5/21/12 Effective March 29, 2012, access to the Smolian Parking Lot #34 and the Loading Dock Area of Spain Rehab will only be from the west on 7th Avenue. 7th Avenue South between 16th and 18th Streets will continue to be closed to thru-traffic, accessible only to local traffic in the vicinity of Central Plant No. 1, the Lister Hill entry, Volker Hall Loading Dock, the Lister Hill parking garage and the School of Optometry Parking Areas. Entry/Exit of the School of Optometry and Lister Hill Parking Areas will only be from the western side.
Pedestrian Traffic Impact
Between the Corner of 7th Avenue South and
18th Street to Spain Rehab Ramp
12/23/2011 thru 06/04/2012
The western sidewalk from the corner of 7th Avenue South and 18th Street ramp entry into Spain Rehab has been closed to pedestrian traffic to accommodate the Steam Project construction. However, vehicular traffic will not be affected. TRAFFIC ALERT Street Closing Announced
19th Street south between
6th Avenue South and 7th Avenue South
Effective Monday, June 4, 2012
Approximate duration: 6 weeks
______________________________________ Due to steam plant project construction, effective Monday, June 4, 2012 19th Street South Between 6th Avenue South and 7th Avenue South will be closed to thru traffic. Local traffic can still enter from 6th Avenue South for patient drop-off to Spain Wallace and Jefferson Tower. TRAFFIC ALERT
Street Closing Announced
6th Ave south between
18th Street South and 19th Street South
Effective Wednesday, May 16, 2012
Approximate duration: 6 weeks
______________________________________ Due to steam plant project construction, effective Wednesday, May 16, 2012 6th Avenue South Between 18th Street South and 19th Street South will be closed to thru traffic.
Local traffic can still enter from 18th Street South for patient drop-off to
Russell Building and North Pavilion
7th Avenue between 19th and 20th Streets South will be closed to thru-traffic effective April 2, 2012. Access to the School of Dentistry and the Kracke Building will be accessible only from 20th Street.
<Duration: Indeterminate at this time> .